Skip to content

Book a 30-minute call

Scheduling is handled by Calendly, whose privacy policy applies to what you enter. Open in Calendly

All services

Tier 1 · Telecom and hybrid infrastructure

Ericsson OSS and ENM migration and operations

Lifecycle, mediation and cutover engineering for Ericsson OSS-RC and ENM estates

We modernize legacy OSS-RC footprints, stabilize Ericsson Network Manager deployments and automate RAN/Core provisioning workflows. Our upgrade and migration plans cover release compatibility, rehearsed maintenance windows and who can authorize recovery.

2-week Assessment Sprint, $14,500 fixed · 100% credited toward an annual retainer or managed agreement signed within 30 days

  1. Baseline the estate

    Installed OSS-RC or ENM release, deployment model, node inventory and interface owners.

  2. Confirm the change path

    Vendor-supported transition path, representative interface tests, stop conditions and who can authorize recovery.

  3. Execute in the approved window

    Phased node waves inside the agreed maintenance window, with pre- and post-change checks and the agreed stop or recovery decision.

  4. Validate and hand over

    Alarm, configuration and performance flows tested on representative nodes with their owners; operator acceptance recorded.

Flows checked before handover
FM · alarms
CM · configuration
PM · performance data
OSS/ENM migration and validation workflow

Illustrative order of work for an OSS-RC or ENM change. Arrows show the sequence of our work, not network connections. Your installed release, deployment model and agreed interfaces set the actual plan.

Where legacy telecom management breaks

Legacy OSS-RC Solaris/x86 estates and cloud-native ENM transitions become difficult to operate when northbound integrations are undocumented, CLI/AMOS scripts have no recovery checks, and alarm or performance data remains trapped in proprietary schemas. A successful cutover must preserve the node state, management interfaces and downstream data flows your operations teams depend on.

What we engineer

OSS-RC to ENM Migration & Consolidation

Audit LTE, 5G NR, IMS and Core element integrations against the installed and target release support matrices. Map topology and northbound consumers, group node re-homing into phased waves, and rehearse cutover with tested fallback scripts and application-owner acceptance.

Declarative Provisioning & CLI Automation

Replace manual provisioning steps with version-controlled Python/Ansible workflows, supported ENM REST NBI calls and cmedit batch orchestration. Validate AMOS/Moshell procedures against the relevant element release, with authorization, idempotency checks and pre-/post-change evidence.

Northbound Alarm, PM & Telemetry Mediation

Build FM/PM/CM adapters using the interfaces your licensed estate exposes: SNMPv3, supported 3GPP bulk XML/JSON feeds, SFTP/TLS and REST. Normalize schemas and timestamps, handle retries and duplicate events, and feed Kafka, VES collectors, SIEM or data-lake consumers where compatible.

ENM Infrastructure on OpenShift & VMware

Size and validate compute, storage I/O, availability zones and networking for the vendor-supported virtualized or containerized deployment model. Test backup/restore, management-plane failover and capacity under representative node and telemetry loads.

Reference stack and standards

Platforms
Ericsson Network Manager (ENM), OSS-RC, Cloud Execution Environment (CEE), Red Hat OpenShift, VMware vSphere/vSAN; deployment choices depend on the supported Ericsson release.
Interfaces & Scripting
ENM REST NBI, cmedit, AMOS/Moshell, NETCONF/YANG, SNMPv3, 3GPP Bulk CM and SFTP/TLS mediation where supported by the installed elements and interfaces.
Automation
Python, Ansible, GitLab CI and custom pre-/post-check harnesses; Kafka and VES adapters for agreed downstream schemas.

We confirm interface availability, vendor entitlements, target-release support and node-owner responsibilities during scoping. Maintenance windows and recovery objectives are validated for your estate; uninterrupted service is not assumed.

Reference architecture

T1Telecom and hybrid infrastructure

Separate management, workload migration and hybrid routing paths, joined by validated platform dependencies.

Telecom management

  1. Ericsson OSS-RCLegacy node inventory · phased retirement
    Phased node re-homing
  2. Ericsson ENMRAN / Core / IMS · REST NBI · cmedit · AMOS
    Northbound telemetry
  3. FM / PM / CM mediation3GPP · SNMPv3 · VES collectors · Kafka

Virtualization & container platform

  1. VMware vSphere / vSANSPBM · I/O baselines · VM dependencies
    Warm / cold migration; final cutover
  2. OpenShift VirtualizationMTV · KubeVirt · ODF / supported CSI
    Runs on the cluster
  3. Red Hat OpenShiftrestricted-v2 workloads · Multus / SR-IOV

Hybrid storage & virtualization

  1. On-premise routingIPAM · segmentation · BGP / BFD where supported
    Hybrid interconnect
  2. vSAN ESA & OpenShift VirtualizationRedundant paths · centralized firewall inspection
    Routed workload access
  3. Hardened cluster foundationOpenShift OCP · restricted-v2 SCCs · ODF · Multi-tenant namespaces · FinOps
Connections across boundaries
Ericsson ENM / Red Hat OpenShift
ENM platform sizing follows the vendor-supported deployment model.
FM / PM / CM mediation / Hardened cluster foundation
Approved telemetry destinations use the defined hybrid routing and security policy.

Southbound element mediation is validated per installed ENM and node software release. MTV warm migrations replicate active blocks in the background and execute final cutover inside a scheduled window with verified ESXi fallback.

Download Mermaid source (.mmd)

Deliverables in your repository

You keep the delivered code, manifests, diagrams, runbooks and validation evidence in your repositories. We agree the systems, acceptance criteria and access prerequisites in the SOW.

  1. Node Migration & Re-Homing Runbook

    Wave-by-wave node lists, prerequisite checks, execution steps, stop conditions and per-wave rollback commands with named recovery owners.

  2. Automated Pre/Post-Check Framework

    Version-controlled scripts recording cell/node state, alarm deltas and KPI baselines before and after the maintenance window.

  3. Northbound Integration Codebase

    Production mediation adapters, schema mappings, retry behavior, API contracts and operating instructions committed to your repository.

  4. Capacity & High-Availability Audit

    Sizing and storage I/O findings, geo-redundancy checks where applicable, backup/restore results and measured failover evidence.

  5. Target Topology in Mermaid (.mmd) Source

    Element management, mediation and hybrid routing diagrams kept as Mermaid source in your repository and updated as waves complete.

  6. Change and Access Evidence Pack

    Redacted change receipts, pre/post-check results and access records for each wave, ready for your auditors and regulators.

Inside the 2-week Assessment Sprint

What the $14,500 sprint covers for this service. Access stays read-only throughout, and you keep the output whether or not you continue.

  1. Days 1–3

    Node and mediation inventory

    Read-only review of OSS-RC and ENM node inventory, supervision and CM sync state, and the northbound REST NBI, SNMPv3 and Kafka/VES consumers.

  2. Days 4–6

    Cutover and schema risk map

    The nodes, scripts and northbound consumers that break on re-homing or an ENM upgrade, and the cmedit and AMOS checks each wave needs.

  3. Days 7–9

    Target topology and wave order

    Target topology in Mermaid (.mmd) source, a re-homing wave order with fallback triggers, and the design of the pre/post-check suite.

  4. Day 10

    Read-out and backlog

    Runbook drafts, the risk register and a fixed-scope backlog for your team or the paired principal pod.

Engineering scope

We migrate and support telecom management systems and hybrid infrastructure, automate how workloads are validated and shipped, and build the portals and network API integrations that expose those platforms to your teams and customers.

Ericsson OSS & ENM Operations

A manager cutover that drops alarms or breaks provisioning is a network incident, not a project slip. The migration has to preserve every fault, configuration and performance flow its consumers rely on.

Best for

A successful manager cutover must preserve alarm delivery, configuration operations and performance-data collection. We trace those flows to their consumers and test them on representative nodes before expanding the change.

Bring to the review

Installed ENM or OSS-RC release, deployment model, node mix and interface inventory.

Implementation

Build a release and node inventory, map northbound and southbound interfaces, and confirm the vendor-supported transition path. Then rehearse the cutover, validate the agreed FM/CM/PM flows and record stop conditions and who can authorize recovery.

Prerequisites

Source and target releases with the vendor compatibility matrix, a node inventory with owners, PKI/CMPv2 and licence status, the northbound consumers of FM, CM and PM feeds, and an agreed maintenance window with a named decision maker.

Operational support

Investigate missing alarms, failed configuration operations and interrupted performance collection using the affected nodes, timestamps and recent changes. Network-element and downstream-system owners participate in interface validation.

Acceptance evidence

Release and node compatibility register, interface test results, cutover and recovery runbook, and operator acceptance record.

  • Release, deployment and representative node compatibility recorded.
  • Agreed alarm, configuration and performance interfaces tested.
  • Stop conditions, recovery approvers and operator handover accepted.
Responsibilities & dependencies

Confirm network-change authority, access owners and applicable vendor licenses and support entitlements. Include element owners when defining interface checks and recovery responsibilities.

Support coverage

Normal support:
Monday–Friday, 8 a.m.–6 p.m. Eastern time (America/New_York), excluding public holidays. Supported systems, access and responsibilities are agreed in writing.
24/7 emergency on-call:
Part of managed operations. For critical customer outages under that coverage, reported through the agreed channel, we aim to investigate, provide substantive engineering updates and attempt resolution within four elapsed hours of emergency receipt, on a best-effort basis.
Resolution:
Resolution within that window is not guaranteed. Other cases follow your SLA.
Licenses and entitlements:
Vendor licenses and support entitlements are separate from our services.

Planning considerations

  1. Network elements
  2. Legacy OSS or ENM
  3. Approved interfaces

Explore a sample service scope. We agree your interfaces, permissions and acceptance criteria before delivery; use the engagement design for deployment.

Legacy OSS-RC and ENM are distinct
Inventory your legacy OSS-RC environment and its dependencies before considering a transition to Ericsson ENM. Check the installed release, deployment model, node types and software versions against the applicable vendor documentation.
Compatibility comes before the change window
ENM supports multiple network domains, but coverage depends on the release and supported node models. Confirm the actual compatibility matrix, licenses and vendor procedures. Model-driven integration does not mean every node release works with every ENM release.
Test the interfaces you actually use
List fault management (FM), configuration management (CM) and performance management (PM) flows. Record each northbound consumer, protocol, authentication method and expected result. Validate alarm delivery, configuration operations and performance data on representative nodes.
Recovery is deployment-specific
Physical, virtual and cloud-native installations can have different prerequisites and recovery paths. Agree the maintenance window, stop conditions and recovery authority. Use the applicable vendor procedure and a representative test environment; do not assume a universal rollback or zero downtime.

Inside a change and recovery plan

Illustrative MOP worksheet showing the gate criteria, telemetry baselines and rollback authority recorded before an ENM maintenance window. It is not a customer result or an executable installation procedure.

Sample review worksheet
Environment baseline
Evidence to record: Installed and target releases, deployment model, node mix and interface owners.
Decision before proceeding: Confirm the inventory and supported change path.
Change readiness
Evidence to record: Representative interface tests, recovery prerequisites and named decision owners.
Decision before proceeding: Approve the maintenance window and stop conditions.
Operational acceptance
Evidence to record: Alarm, configuration and performance checks; operator handover record.
Decision before proceeding: Accept the results or follow the agreed recovery decision.
Open the full worksheet

Before we begin

What do you need to assess our environment?

Start with your installed release, deployment model, node types, interfaces and intended change. Leave credentials and production records out of the inquiry form.

Can legacy OSS-RC be treated as an ENM upgrade?

Legacy OSS-RC and Ericsson ENM are distinct systems. We provide legacy OSS-to-Ericsson ENM migrations; your installed release, deployment model and the applicable vendor-supported path determine the migration scope.

How are maintenance windows and recovery agreed?

You approve the network change and maintenance window. Before production work, we agree the test evidence, stop conditions, recovery prerequisites and the person authorized to make the recovery decision.

Who provides licenses and vendor support?

Confirm the owners of node access, vendor licenses and support entitlements during scoping. Our integration and support services do not replace vendor licensing or establish vendor authorization.